2017 BP Gas Station
Sołeczno
ARKOP, as the general contractor, successfully commissioned the BP gas station in Sołeczno. The project was carried out with the highest quality and safety standards, which confirm the company’s good reputation in the construction sector.
The works were carried out in the scope of:
- Macro leveling 13,000 m³
- Paved road surfaces in an area of 5,541 m²
- Green areas 2,600 m²
- Tight concrete slabs under the shelter 3.26 m²
- LV network electrical connection
- Water supply connection PE pipe Ø 110 – 130 m
- Sanitary and rainwater sewage connections and networks with oil separators made of
- PVC pipes Ø 160 B 400 to 250 B400 in the amount of 900 m
- Installation of fuel tanks 2 pieces
- Installation of an LPG tank
- Installation of the AdBlue tank
- Foundations of tank slabs, shop, dispenser shelters and price monoliths
- Construction of the station building and restaurant along with finishing works of 405 m²
- Delivery and installation of sewage treatment plants
- Coordination of investor works and deliveries